Baso BGH2UNCNTRLHT-01 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Sprzęt komputerowy Baso BGH2UNCNTRLHT-01. BASO BGH2UNCNTRLHT-01 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
Installation Instructions BGH
Issue Date October 4, 2010
© 2010 BASO Gas Products 1
Part No. BASO-INS-BGH, Rev. - www.baso.com
BGH2UNCNTRLHT-01 Universal
Hot Surface Ignition Control
Application
The BASO Gas Products BGH2UNCNTRLHT-01
Universal Series Hot Surface Ignition (HSI) control is
microprocessor based with timed ignition and suited
for replacement or new applications. Applications for
hot surface ignition modules include agricultural
equipment, space heaters, furnaces,
residential/commercial boilers, water heaters, pool
and spa heaters, and a variety of other commercial
cooking equipment.
This control includes a 5 position DIP switch allowing
up to 32 programmable pre-defined timing selections
to retrofit other Hot Surface Ignitions with flame
sensing rectification, such as: Johnson Controls,
Honeywell, White Rodgers, Fenwal, and
Robertshaw.
The BGH2UNCNTRLHT-01 works with single-rod or
dual-rod sensing to prove a flame. The control has a
continuous and precise monitoring of the HSI
element, wiring, and gas valve, shutting down in the
event of a failure. For a complete listing of
specifications, refer to the Technical Specifications
section.
Installation
IMPORTANT: Only qualified personnel
should install or service BASO Gas Products®.
These instructions are a guide for such personnel.
Carefully follow all instructions for the appliance.
IMPORTANT: Make all gas installations in
accordance with applicable local, national, and
regional regulations.
!
WARNING: Risk of Explosion or Fire.
Do not install the control in an area that is exposed
to water (for example, dripping, spraying, rain). Do
not use the control if it has been exposed to water.
Exposure to water may cause malfunction and can
lead to an explosion or fire and may result in
severe personal injury or death.
Przeglądanie stron 0
1 2 3 4 5 6 ... 18 19

Podsumowanie treści

Strona 1 - Hot Surface Ignition Control

Installation Instructions BGH Issue Date October 4, 2010 © 2010 BASO Gas Products 1 Part No. BASO-INS-BGH, Rev. - www.baso.com BGH2U

Strona 2

10 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Checkout ! WARNING: Risk of Explosion or Fire. Verify that t

Strona 3

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 11 • 100% Shutoff (Flame Not Sensed) With 3 Ignition Trials (

Strona 4

12 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions NoYe sPower OnInitialize software,test ROM, RAM and E2get vol

Strona 5

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 13 Troubleshooting! WARNING: Risk of Personal Injury. Do not

Strona 6

14 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions YesNoNoYesTurn on powerand gas.Close thermostatcontacts.Modul

Strona 7

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 15 Maintenance Requirements in Severe Environments Regular pre

Strona 8

16 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Cut out and leave near control. Green LED Indications During

Strona 9 - Setup and Adjustments

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 17 Notes

Strona 10 - Operation

18 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Notes

Strona 11 - Sequence of Operation

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 19 Technical Specification Product BGH2UNCNTRLHT-01 Universal

Strona 12

2 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Table 1: BGH2UNCNTRLHT-01 Universal Cross Reference Switch Po

Strona 13 - Troubleshooting

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 3 Table 1: BGH2UNCNTRLHT-01 Universal Cross Reference Switch P

Strona 14

4 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Table 1: BGH2UNCNTRLHT-01 Universal Cross Reference Switch Pos

Strona 15 - Repairs and Replacement

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 5 Table 1: BGH2UNCNTRLHT-01 Universal Cross Reference Switch P

Strona 16

6 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions Replacing the Existing Ignition Control ! CAUTION: Risk of E

Strona 17

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 7 GND(24V)GND(VALVE)GND(BURNER)HSIL1HSI24V(TH)VALVESENSE(REMOT

Strona 18

8 BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions GND(24V)GND(VALVE)GND(BURNER)HSIL1HSI24V(TH)VALVESENSE(REMOTE)

Strona 19 - Technical Specification

BGH2UNCTRLHT-01 Universal Hot Surface Ignition Control Installation Instructions 9 Setup and AdjustmentsSelect Dip Switch PositionsA 5 position

Komentarze do niniejszej Instrukcji

Brak uwag